Warranty & continuity

Structural performance, workmanship, and installed manufacturer warranties converge at practical completion — this page is a scaffold for your solicitor-reviewed policy.

Defect-liability posture

Each contract should define the defect-notification window, snag-list workflow, exclusions (misuse / third-party alteration), escalation path, response times per severity, and linkage to subcontractor warranties.

  • Document-controlled handover pack (tests, commissioning, manuals, attic of spares).
  • Photographed baseline condition signatures at PCC.
  • Defined categories: latent versus patent; fair wear exclusions; climatic exposure limits.

Manufacturer-backed items

Roof membranes, elevators, gensets, and specialist coatings carry OEM terms — DAAN Construction (PVT) LTD forwards registration packs and advises on preventative maintenance calendars so coverage stays intact.

Important: Replace this draft with durations (months and years per element), ticketing email and SLA, escalation matrix, and statutory references approved by counsel.